NEXLUVE Dog Slip Lead 6ft, Anti-pull Dog Training Leash Rope Lead with Durable padded 2 Handles 6FT/182cm Adjustable Dog long Lead for Small, Medium and Large Dogs (BLACK)

Original price was: £9.99.Current price is: £7.99.