Price: [price_with_discount]
(as of [price_update_date] – Details)
Product Description


Fanshiontide Dog Training Lead: Great for walking running or training
– 100% brand new and high quality polypropylene material. The PP dog leash can be used in any weather without damaging it. The dog leash will not stretch or deform.
– Trigger hook for easy attachment to your dog’s own collar, rotated by 360 degree allows your pet dogs to play more secure. Allows you to teach your dog recalls and other obedience skills.
– The lead is suitable for most of the pets!



Comfortable Hand Strap
Thicker hand strap is more comfortable and safe to handle. Moreover, you can control and protect your dog better.
360°Swivel-Style Buckle
The 360°rotating buckle design prevents the leash from twisting and makes your pet safer to play.
Multi-Functional Use
Long lead Great for hiking, camping, training, hunting, games, fun, education, backyard, beach, recall training, outdoor play with tennis balls, and swimming.


Specifications: Length: 10m/33ft Width: 2cm/0.8 inch Material: polypropylene Package:1 * Long Dog Leash
Note:
When using the leash, please hold the handle instead of the rope, otherwise, the dog may run suddenly and hurt your hand.
Be careful! There is a needle to fix the dog leash, it is easy to find, please pay attention when disassembling.

【Leash Size】10M/33Feet*2CM. Our extra long lead has the length needed to allow them to wander and ensure your command to come.
【Durable Training Lead】This durable polypropylene dog training leash will outlast nylon leashes. All stitching is reinforced and the metal buckle made of zinc alloy is high quality and durable.
【Swivel-style Zinc Alloy Buckle】The dog lead comes with a Swivel-style Buckle for easy to attach to your dog’s collar, rotated by 360 degree secure your pet to play in any way safely.
【Long Lead】This training leash is great for teaching your dog recalls. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play or swimming.
【Widely applicable】Suitable for many pets like Samoyed, Teddy, Husky, Rottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden Retriever, German Shepherd, Tibetan Mastiff and other breeds
[ad_2]























Reviews
There are no reviews yet.